3720 Butner RoadSouth Fulton, GA
Development Opportunity

3720 Butner Road

City of South Fulton, Fulton County, Georgia

A 3.8-acre residential development opportunity with a clear path to eight single-family homes. Full zoning analysis, FEMA flood zone strategy, and conceptual site plan included.

3.8Acres

Total Land Area

8Homes

Proposed Development

2,500sq ft

Per Home

R-4Zoning

Proposed District

3.8 Acres of Opportunity in South Fulton

This property represents a rare chance to develop a private family compound or small residential subdivision in the growing City of South Fulton. The land has never flooded since its acquisition in 2019, and a clear legal pathway exists to resolve the FEMA flood zone designation that has previously blocked development.

With the right zoning reclassification and a FEMA Letter of Map Amendment, this parcel can support eight 2,500-square-foot single-family homes — an ideal configuration for a family compound or a small-scale residential development.

693 ft
North road frontage
0
Flood events since 2019
R-4
Target zoning district
60 days
Typical LOMA processing

Property Details

Property Address3720 Butner Road, Atlanta, GA 30349
JurisdictionCity of South Fulton, Fulton County, GA
Total Area3.8 Acres (165,528 sq ft)
Current Land UseResidential 1 Family
Improvement TypeRanch (existing structure)
Existing Structure875 sq ft (dilapidated)
North Side693 linear feet
West Side272 linear feet
South Side285 linear feet
SE Boundary / Road Frontage623 linear feet (Butner Road)
FEMA Flood ZoneZone AE — FIRM Panel 13121C0341F
Overlay DistrictCliftondale Overlay District
📍

Located in the Cliftondale Community

The property lies within the Cliftondale Overlay District, but single-family detached homes are expressly exempt from overlay design requirements.

Zoning Analysis

What Can Be Built on This Land

A rezoning from R-1 to R-4 is the key step that unlocks the full development potential of this 3.8-acre parcel.

Residential subdivision site plan drawing

Conceptual subdivision layout — 8 homes on 3.8 acres

Cliftondale Overlay District — Exempt

Per Article XII-L, Section 12L.2 of the Fulton County Zoning Resolution, the Cliftondale Overlay District expressly excludes "single family detached dwelling units" from all overlay design requirements. Your proposed development is fully exempt.

!

Subdivision Required

Section 402.05 of the Zoning Ordinance limits each lot to one principal building. To build eight homes, the parcel must be legally subdivided into eight separate lots before building permits can be issued.

R-4 Single-Family (Recommended)

Recommended

The optimal district for your goal. Allows up to 18 lots on 3.8 acres, comfortably accommodating 8 homes with generous lot sizes.

Min. Lot Size9,000 sq ft per lot
Homes PossibleUp to 18 (8 proposed)
Min. Lot Width70 ft
Front Setback25 ft
Rear Setback40 ft
Side Setback7 ft (interior)
Max. Height35 ft
Min. Floor Area1,000–1,100 sq ft
Assessment: Ideal for 8 homes. Each lot would average ~20,691 sq ft — more than double the minimum.

Rezoning Process Overview

  1. 1.Hire a local land use attorney or planning consultant
  2. 2.Submit rezoning application to City of South Fulton Planning Dept.
  3. 3.Attend public hearing before the Planning Commission
  4. 4.City Council vote on rezoning ordinance
  5. 5.Upon approval, submit subdivision plat for review

Removing the Flood Zone Designation

The property is currently mapped in FEMA Zone AE (100-year flood zone) on FIRM Panel 13121C0341F. However, because the land has never flooded since 2019, there is strong reason to believe the natural ground elevation is above the Base Flood Elevation — making it eligible for a Letter of Map Amendment (LOMA).

FEMA flood zone map with LOMA Approved stamp

Current Flood Zone Facts

FEMA ZoneZone AE
FIRM Panel13121C0341F
Effective DateSeptember 18, 2013
Flood HistoryNone since 2019
LOMA PathwayMT-EZ Form / LOMC Portal
FEMA Review Fee$0 (no charge)
Typical Timeline45–60 days
If Fill is Required: LOMR-F

If the survey reveals that any portion of the land is below the BFE, engineered fill can be placed to raise building pads. A Letter of Map Revision Based on Fill (LOMR-F) would then be filed. This process is more complex but remains a viable path.

The LOMA Process — Step by Step

01

Commission a Topographic Survey

Hire a Licensed Land Surveyor (LLS) or Registered Professional Engineer (PE) in Georgia. They will conduct a precise topographic survey to determine the Lowest Adjacent Grade (LAG) and lowest lot elevation across the entire 3.8-acre parcel.

Timeline: 2–4 weeks
Cost: $1,500–$4,000
02

Obtain an Elevation Certificate

The surveyor will compare your property's lowest ground elevation to the Base Flood Elevation (BFE) shown on FEMA FIRM Panel 13121C0341F. If your land is at or above the BFE, they will complete a FEMA Elevation Certificate documenting this fact.

Timeline: Included in survey
Cost: Included in survey
03

Submit the LOMA Application to FEMA

Using the MT-EZ form or FEMA's Online Letter of Map Change (LOMC) portal, submit the application along with the Elevation Certificate, property deed, and a copy of the FIRM panel. FEMA does not charge a fee for LOMA review.

Timeline: 1–2 days to submit
Cost: No FEMA fee
04

FEMA Review and Determination

FEMA reviews the application and issues a formal determination. If approved, the LOMA officially removes the property from the Special Flood Hazard Area (Zone AE), satisfying the City of South Fulton's subdivision approval requirements.

Timeline: 45–60 days
Cost: No fee

Once the LOMA is Approved

The LOMA officially removes the property from FEMA Zone AE. This satisfies the City of South Fulton's requirement under Section 402.02 of the Zoning Ordinance, which mandates that all buildable lot areas be located outside a floodplain before subdivision approval. Flood insurance will no longer be mandatory for mortgage lenders, making the property significantly more attractive to buyers and lenders alike.

Conceptual Site Plan

Eight Homes on 3.8 Acres

The layout below shows how eight 3BR/2BA homes can be arranged across the property while meeting all R-4 setback requirements.

Conceptual site layout for 8 homes at 3720 Butner Road

Conceptual site plan drawn to scale. North side: 693 ft · West side: 272 ft · South side: 285 ft · SE boundary: 623 ft

Architectural rendering of craftsman-style homes in a subdivision

Each Home: 3 BR / 2 BA / 2,500 sq ft

🛏
3 Bedrooms
Spacious master suite + 2 additional bedrooms
🚿
2 Bathrooms
Master bath + shared hall bath
📐
2,500 sq ft
Single-story or two-story configuration
🏠
50 × 50 ft Footprint
Efficient single-story layout
🚗
Driveway Access
Individual driveways from internal road
🌳
Private Lots
Average ~20,691 sq ft per lot

R-4 Setback Requirements

Front Setback
From Butner Road / south boundary
25 ft
Rear Setback
From north property line
40 ft
Interior Side
Between adjacent lots
7 ft
Max. Height
Allows 2-story construction
35 ft
Min. Lot Width
Per R-4 district standards
70 ft
Internal Road
Central spine road
20 ft wide

Lot Area Calculation

Total Property Area165,528 sq ft
Internal Road (est.)− 13,860 sq ft
Net Buildable Area≈ 151,668 sq ft
÷ 8 Lots= 18,959 sq ft avg/lot
R-4 Minimum Lot Size9,000 sq ft
Surplus per Lot+9,959 sq ft

Each proposed lot exceeds the R-4 minimum by more than double, providing generous spacing between homes and ample yard area for families.

Next Steps to Unlock Development

The path from the current state to a fully permitted eight-home subdivision is clear and achievable. The following steps outline the recommended sequence of actions.

01
Immediate

Commission a Topographic Survey

Hire a licensed Georgia surveyor to determine the property's ground elevations relative to the FEMA Base Flood Elevation. This is the foundational step that unlocks everything else.

Engage a surveyor
02
Within 30 Days

File the LOMA Application with FEMA

Once the Elevation Certificate confirms favorable elevations, submit the LOMA application via FEMA's Online LOMC portal. No fee is required. FEMA typically responds within 45–60 days.

Submit to FEMA
03
Concurrent

Apply for Rezoning to R-4

Engage a local land use attorney or planning consultant to prepare and submit a rezoning application to the City of South Fulton Planning Department. This can proceed concurrently with the LOMA process.

File rezoning application
04
After LOMA + Rezoning

Submit Subdivision Plat

Once both the LOMA and rezoning are approved, submit a preliminary subdivision plat based on the conceptual site plan. This divides the 3.8 acres into eight individual lots, each eligible for a building permit.

Engage a civil engineer
Inquire About This Property

Ready to Explore This Opportunity?

This analysis demonstrates a clear, actionable path to developing eight single-family homes on this 3.8-acre parcel. The LOMA process is straightforward, the rezoning is supported by the parcel's size and location, and the conceptual site plan confirms the feasibility of the development vision.

Property Contact

Address
3720 Butner Road
Atlanta, GA 30349
Jurisdiction
City of South Fulton
Fulton County, Georgia
Parcel Size
3.8 Acres (165,528 sq ft)

This analysis is based on a review of the City of South Fulton Zoning Ordinance, the Cliftondale Overlay District regulations, and FEMA FIRM Panel 13121C0341F. It is provided for informational purposes only and does not constitute legal, engineering, or professional planning advice. Consult a licensed attorney, surveyor, and land use planner before making development decisions.